-
1 SCHEDULE
English-Arabic construction engineering dictionary > SCHEDULE
-
2 Scheduling
جدولة ، برمجة -
3 Spreading
جدولة ، انتشار ، توزيع -
4 Rescheduling
إعادة جدولة(دين) -
5 master scheduling
The process for generating a timetable for matching supply with demand. -
6 ar-sa محددة الخصائص
A scheduling method that assumes that limited capacity for labor and machines is available. -
7 finite scheduling
A scheduling method that assumes that limited capacity for labor and machines is available. -
8 backward scheduling
A method for determining a production schedule by beginning with the date the order is required to be ready and working backward to the date work must begin in order to meet the required due date. -
9 forward scheduling
A method for determining a production schedule by beginning with the production start date and working forward to determine the production completion date. -
10 intercompany master scheduling
The process for generating a timetable for two or more legal entities that are part the same organization.English-Arabic terms dictionary > intercompany master scheduling
-
11 intercompany payment journal
A journal that is used to post intercompany payments.English-Arabic terms dictionary > intercompany payment journal
-
12 Task Scheduler
A tool which enables users to automatically perform routine tasks on a chosen computer by monitoring whatever criteria the users choose to initiate the tasks (referred to as triggers) and then executing the tasks when the criteria is met. -
13 Task Scheduler Wizard
A Windows Vista wizard that allows users to set up tasks with Task Scheduler. -
14 Schedule
A button that launches the Service Scheduling form. -
15 vesting schedule
The manner in which-long term variable compensation is distributed to an employee. Long-term incentives are awarded at one time but distributed at a later time. -
16 effort-driven scheduling
"The default method of scheduling in Project; the duration of a task shortens or lengthens as resources are added or removed from a task, while the amount of effort necessary to complete a task remains unchanged." -
17 Schedule a Meeting
A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s). -
18 user-controlled scheduling
A feature that allows the user to specify manual or automatic scheduling on a per-task basis.English-Arabic terms dictionary > user-controlled scheduling
-
19 manual scheduling
"A type of scheduling that gives the user control over start and finish dates of their tasks. Tasks do not automatically get moved by the scheduling engine. The user can enter blank dates, textual dates, or dates that do not follow dependencies, calendar, and other scheduling engine rules." -
20 tab control
A standard control that resembles a notebook and lets the user navigate different sections of information without leaving the current element on the screen.
См. также в других словарях:
جدول — I الوسيط (الجَدْوَلُ): مجرّى صغير يُشَقّ في الأَرض للسُّقيا. و صفحة يُخَطّ فيها خطوط متوازية قد تتقاطع فتكوِّنُ مربَّعاتٍ يُكتب فيما بينها. (مو). (ج) جداول. II معجم اللغة العربية المعاصرة جدوَلَ يُجدول، جدولةً، فهو مُجَدْوِل، والمفعول مُجَدْوَل • … Arabic modern dictionary