-
1 Konstruktionsänderung
Konstruktionsänderung
change in design;
• Konstruktionsbüro drawing (Br.) (drafting) office, drafting room (US), technical bureau, engineering (designing) department;
• ins Konstruktionsbüro zurück back to the drawing board;
• zehn Jahre für den Weg vom Konstruktionsbüro über die Ausführung zur Inbetriebnahme benötigen to take ten years from the drawing board to construction and into operation;
• Konstruktionsdaten design data;
• neue Konstruktionselemente beinhalten to embody new features;
• Konstruktionsentwurf engineering design;
• Konstruktionsfehler fault of construction, structural defect (error), (Maschine) constructional defect (error), defect in machinery, fault in the construction of a machine, flaw;
• Konstruktionsfirma engineering firm (shop);
• Konstruktionskosten cost of construction, engineering charges;
• Konstruktionsmerkmale constructive features;
• Konstruktionsnorm code of construction;
• Konstruktionsplan erection scheme.
См. также в других словарях:
Data model — Overview of data modeling context: A data model provides the details of information to be stored, and is of primary use when the final product is the generation of computer software code for an application or the preparation of a functional… … Wikipedia
Engineering geology — is the application of the geologic sciences to engineering practice for the purpose of assuring that the geologic factors affecting the location, design, construction, operation and maintenance of engineering works are recognized and adequately… … Wikipedia
Engineering economics — Engineering economics, previously known as engineering economy, is a subset of economics for application to engineering projects. Engineers seek solutions to problems, and the economic viability of each potential solution is normally considered… … Wikipedia
Design thinking — refers to the methods and processes for investigating ill defined problems, acquiring information, analyzing knowledge, and positing solutions in the design and planning fields. As a style of thinking, it is generally considered the ability to… … Wikipedia
Data I/O Corporation — [http://finance.yahoo.com/q?s=daio NASDAQ:DAIO] (commonly known as Data I/O ) is a manufacturer of programming and automated device handling systems for programmable integrated circuits. The company is headquartered in Redmond, Washington with… … Wikipedia
Design Impact Measures — are use to qualify projects for various rating systems and to guide both design and regulatory decisions from beginning to end. Some like the Greenhouse Gas inventory may also be required globally for all business decisions. Some like the LEED… … Wikipedia
Design impact measures — are use to qualify projects for various rating systems and to guide both design and regulatory decisions from beginning to end. Some like the greenhouse gas inventory may also be required globally for all business decisions. Some like the LEED… … Wikipedia
Design closure — is the process by which a VLSI design is modified from its initial description to meet a growing list of design constraints and objectives. Every step in the IC design (such as static timing analysis, placement, routing, and so on) is already… … Wikipedia
Design–build — Design build (or design/build, and abbreviated D–B or D/B accordingly) is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single… … Wikipedia
Data modeling — The data modeling process. The figure illustrates the way data models are developed and used today. A conceptual data model is developed based on the data requirements for the application that is being developed, perhaps in the context of an… … Wikipedia
Design knowledge — There is a large body of knowledge that designers call upon and use during the design process to match the ever increasing complexity of design problems.[1] Design knowledge can be classified into two categories [2]: product knowledge and design… … Wikipedia