-
1 dewatering method
Англо-русский словарь нормативно-технической терминологии > dewatering method
-
2 dewatering method
Большой англо-русский и русско-английский словарь > dewatering method
-
3 dewatering method
Англо-русский словарь нефтегазовой промышленности > dewatering method
-
4 dewatering method
Нефть: метод обезвоживания -
5 deep well dewatering method
English-Russian mining dictionary > deep well dewatering method
-
6 method
метод; способ; средство; приём; технология; система; порядокconstant casing pressure method — метод борьбы с выбросом поддержанием постоянного давления в затрубном пространстве
displacement method of plugging — цементирование через заливочные трубы (без пробок, с вытеснением цементного раствора буровым)
gas-drive liquid propane method — процесс закачки в пласт газа под высоким давлением с предшествующим нагнетанием жидкого пропана
single core dynamic method — динамический метод определения относительной проницаемости по отдельному образцу
transient method of electrical prospecting — метод электроразведки, использующий неустановившиеся электрические явления
— colour band method
* * *
метод; способ; приёмbullhead well control method — способ глушения скважины с вытеснением пластового флюида в пласт из кольцевого пространства
constant bottomhole pressure well control method — способ глушения скважины при постоянном забойном давлении
driller's well control method — способ глушения скважины с раздельным удалением пластового флюида и сменой бурового раствора
one-circulation well control method — способ глушения скважины с одновременным удалением пластового флюида и сменой бурового раствора
reliability matrix index method — метод контроля за обеспечением надёжности путём задания показателей надёжности
two-circulation well control method — способ глушения скважины с разделёнными удалением пластового флюида и сменой бурового раствора
Vlugter method of structural group analysis — структурно-групповой метод анализа (углеводородов) по Флюгтеру
wait and weight well-control method — способ глушения скважины с одновременным удалением пластового флюида и сменой бурового раствора
* * *
метод, способ
* * *
метод; способ; приём- method of assurancemethod for determination relative water wettability — метод определения относительной водосмачиваемости ( пород);
- method of borehole section correlation
- method of calculating gas reserves
- method of circles
- method of defining petroleum reserves
- method of defining reserves
- method of determining static corrections
- method of drilling
- method of drilling with hydraulic turbine downhole motor
- method of drilling with hydraulic turbine downhole unit
- method of estimating reserves
- method of evaluating petroleum reserves
- method of formation
- method of formation damage analysis
- method of formation heterogeneity analysis
- method of formation nonuniformity analysis
- method of increasing oil mobility
- method of limiting well production rate
- method of liquid saturation determination
- method of maintaining reservoir pressure
- method of maintaining reservoir pressure by air injection
- method of maintaining reservoir pressure by gas injection
- method of maintaining reservoir pressure by water injection
- method of measuring critical water saturation
- method of mirror
- method of operation
- method of planting
- method of sample taking
- method of sampling
- method of sharpening
- method of stimulating production
- method of strong formation explosions
- method of testing
- method of three coefficients
- airborne magnetometer method
- air-hammer drilling method
- airlift well operation method
- alcohol-slug method
- arc refraction method
- aromatic adsorption method
- average velocity method
- average velocity approximation method
- bailer method of cementing
- band method
- barrel per acre method
- Barthelmes method
- basic volume method of estimating reserves
- beam pumping well operation method
- blasthole method
- bomb method
- borderline method
- borehole method
- borehole wall consolidation method
- bottom-packer method
- bottom water isolation method
- bottom water shutoff method
- bottomhole pressure build-up method
- broadside refraction method
- cable tool percussion drilling method
- Cabot method
- building method
- bullhead well control method
- capillarimetric method for determination wettability
- carbonized water injection method
- casing method of cementing
- casing-pressure method
- catenary pipe laying method
- cementing method
- cetane test method
- charcoal method
- chemical method of borehole wall consolidation
- chemical method of borehole wall lining
- circulating method
- clean recirculation method
- cold method of oil fractionation
- combination drilling method
- common-depth-point method
- common-midpoint method
- common-reflection-point method
- compressional-wave method
- concurrent method
- concurrent method of well killing
- constant bottomhole pressure well control method
- constant casing pressure method
- constant pit level method
- continuous-correlation method
- continuous-profiling method
- controlled directivity reception method
- converted wave method
- copper dish method
- correlation method of refracted waves
- correlation refraction method
- countercirculation-wash-boring method
- crosshole method
- cube method
- curved-path method
- cyclic steam-soaking secondary oil recovery method
- cycloidal ray-path method
- cylinder method
- deep-hole method
- deep-refraction method
- delay-and-sum method
- derrick assembling method
- derrick erection method
- desalting method
- development method
- dewatering method
- diesel cetane method
- differential liberation method
- diffraction stack method
- dipole profiling method
- direct method of orientation
- directional survey method
- dispersed gas injection method
- displacement method of plugging
- distillation method
- distillation method of liquid saturation determination
- double control method
- downhole method
- downhole sucker-rod pump well operation method
- down-the-hole induced polarization method
- drill steam method of coke removal
- driller's method
- driller's well control method
- drilling method
- drilling-in method
- dual coil ratiometer method
- effusion method
- electrical method of geophysical prospecting
- electrical-audibility method
- electrical-exploration method
- electrical-logging method
- electrical-prospecting method
- electrical-sounding method
- electrical-surveying method
- electrochemical method of borehole wall consolidation
- electrochemical method of borehole wall lining
- electromagnetic method of orientation
- electromagnetic-exploration method
- electromagnetic-prospecting method
- electromagnetic-profiling method
- electromagnetic-sounding method
- electromagnetic-surveying method
- enhanced recovery method
- enriched gas injection method
- Eshka method
- evaporation method of measuring critical water saturation
- exploration method
- exploration prospecting survey method
- exploration seismic method
- explosion drilling method
- explosion seismic method
- express method
- express method of production calculation
- filter-and-sum method
- fire flooding method
- firing line method
- first-break method
- first-event method
- float-and-chains method
- float-on method
- formation evaluation method
- four-point control method
- fracture method
- freepoint-string shot method
- freezing method
- freezing point depression method
- from-bottom-upward method of derrick assembling
- from-top-downward method of derrick assembling
- frontal advance gas-oil displacement method
- Galician method
- gamma-ray method
- gas blow-around method
- gas-chromatography method
- gas-drive liquid propane method
- gaslift well operation method
- gas-production test method
- gas-recovery method
- geological petroleum exploration method
- geological petroleum prospecting method
- geophysical petroleum exploration method
- grasshopper pipeline coupling method
- gravity method of geophysical prospecting
- gravity exploration method
- heat injection secondary oil recovery method
- hectare method of estimating reserves
- hesitation method
- high-pressure dry gas injection method
- high-resolution method
- hit-and-miss method
- holoseismic method
- horizontal-loop method
- hot-water drive method
- hydraulic drilling method
- hydraulic fracturing method
- hydraulic hammer drilling method
- hydraulic jet drilling method
- hydrodynamic method of calculating oil production
- hydrodynamic drilling method
- ice-plug method
- image method
- indirect method of orientation
- induction logging method
- infiltration method
- injection flow method
- in-situ combustion method
- interval change method
- isolation method
- isoline method of reserves estimation
- Kiruna method
- knock intensity method
- lamp method
- lean mixture rating method
- liquid solvent injection method
- logging method
- long-hole method
- long-interval method
- long-wire transmitter method
- luminescent-bitumen method
- magnesium-hydroxide method
- magnetic method of geophysical prospecting
- magnetic-exploration method
- magnetic-flaw detection method
- magnetic-particle method
- magnetic-particle flaw detection method
- magnetoelectrical control method
- magnetometrical method
- magnetotelluric method
- magnetotelluric-exploration method
- magnetotelluric-sounding method
- maintenance method
- mercury injection method of measuring critical water saturation
- micrometric method of rock analysis
- microseismic method
- migration method
- mining method
- moving-plug method of cementing
- moving-source method
- mud-balance method
- mudcap method
- mudflush drilling method
- multiple detection method
- nonionic surfactant water solution injection method
- nonreplacement method
- Norwegian method
- oil drive method
- oil production method
- oil recovery method
- oil withdrawal method
- one-agent borehole wall consolidation method
- one-agent borehole wall lining method
- one-circulation well control method
- outage method
- oxygen-bomb method
- parabolic method
- passive method
- pattern method
- pattern-type gas injection method
- penetration method
- penetrating fluid method
- percussion method
- perforation method
- Perkins method
- phase-velocity method
- physicochemical method of borehole wall consolidation
- physicochemical method of borehole wall lining
- picric acid method
- pipe-bridge method
- pipe-driving method
- pipeline-assembly method
- pipeline-coupling method
- placement method
- plane front method
- plasma drilling method
- polarization method
- Poulter method
- pour point depression method
- pressure build-up method of formation damage analysis
- pressure build-up method of formation heterogeneity analysis
- pressure-drop method of estimating gas reserves
- primary oil recovery method
- probe method
- producing method
- producing well testing method
- production method
- production test method
- profiling method
- projected-vertical-plane method of orienting
- prospecting method
- pump-out method
- punching method
- radioactive method
- radioactive method of geophysical prospecting
- radio-direction-finder method
- ray-path method
- ray-stretching method
- ray-tracing method
- record presentation method
- recovery method
- rectilinear ray-path method
- reflection method
- reflection interpretation method
- refracted wave method
- refraction method
- refraction correlation method
- refraction interpretation method
- reliability method
- reliability matrix index method
- remedial cementing method
- replacement method
- repressuring method
- resistivity method
- restored-state method of measuring critical water saturation
- retort method of liquid saturation determination
- reversed refraction method
- ring-and-ball method
- rod tool percussion drilling method
- rodless pump well operation method
- roll-on method
- rope-and-drop pull method
- rotary drilling method
- rotation drilling method
- sampling method
- sand jet method
- saturation method
- saturation method of pore volume measurement
- secondary oil recovery method
- sectional method of pipeline assembly
- sectional pipe-coupling method
- sectorial pipe-coupling method
- sedimentology method of measuring particle size distribution
- seismic method
- seismic method of geophysical prospecting
- seismic-detection method
- seismic-exploration method
- seismic-identification method
- seismic-interpretation method
- seismic-reflection method
- seismic-refraction method
- self-potential method
- sequence firing method
- shear-wave method
- short-hole method
- shot-drilling method
- shot-popping method
- side-tracking method
- side-wall coring method
- single-core dynamic method
- single-fold continuous-coverage method
- slalom-line method
- small-bore deep-hole method
- soap suds method
- sounding method
- spontaneous polarization method
- squeeze cementing method
- squeezing method
- standardizing performance method
- standby method
- stationary liquid method of relative permeability determination
- statistical method of calculating oil production
- statistical method of estimating reserves
- steam oil drive method
- stepwise method of McCabe and Thiele
- stimulation method
- stove pipe method
- stove pipe flange method of rolling beams
- straight ray-path method
- subsurface method of geophysical prospecting
- suction method of cleaning
- summation method
- surface method of geophysical prospecting
- surface-wave method
- swabbing method
- swinging-gage method
- tertiary oil recovery method
- testing method
- thermal-acid formation treatment method
- thermal-recovery method
- thickened water injection method
- three-dimensional seismic method
- thumper method
- top-packer method
- towing method
- transient method of electrical prospecting
- transmitted wave method
- transposed method
- triaxial test method
- tubing method of cementing
- two-agent borehole wall consolidation method
- two-agent borehole wall lining method
- two-circulation well control method
- ultrasonic method
- ultrasonic flaw detection method
- variable-area method
- velocity-analysis method
- vertical loop method
- Vibroseis method
- Vlugter method of structural group analysis
- volume method of estimating reserves
- volume-statistical method of estimating reserves
- volume-weight method of estimating reserves
- volumetric method of estimating reserves
- volumetric-genetic method of estimating reserves
- wait-and-weight well-control method
- Walker's method
- wash-and-drive method
- washing method
- water flooding method
- water influx location method
- weathering computation method
- weight-drop method
- weight-saturation method
- well-casing method
- well-completion method
- well-control method
- well-drill method
- well-geophone method
- well-operation method
- well-shooting method
- well-testing method
- wireline method
- X-ray diffraction method* * * -
7 метод обезвоживания
Большой англо-русский и русско-английский словарь > метод обезвоживания
-
8 Well
[Wellington] — веллингтон (свита отдела леонард пермской системы, Среднеконтинентальный район)
* * *
to abandon a well — ликвидировать скважину;
to bean a well back — снижать дебит фонтанирующей скважины;
to bean a well up — повышать дебит фонтанирующей скважины;
to blow a well — открывать фонтанирующую скважину на короткое время (для удаления воды, песка);
to bring a well in — вызывать приток пластового флюида в скважину;
to bump off a well — отсоединять насосную скважину от группового привода;
to case a well — обсаживать ствол скважины;
to complete a well — заканчивать скважину;
to dry up a well — откачивать жидкость из скважины;
to flow a well hard — эксплуатировать фонтанирующую скважину с максимально возможным дебитом;
to flush a well out — промывать скважину;
to hand off a well — отсоединять насосную скважину от группового привода;
to junk a well — ликвидировать скважину;
to kill a well — глушить скважину (уравновешивать пластовое давление);
to knife a well — чистить скважину (от парафина) скребками;
to line a well — обсаживать ствол скважины;
to mud a well up — подавать буровой раствор в скважину (после бурения с продувкой);
to place a well on choke — начинать дросселировать поток из скважины с помощью штуцера;
to plug up a well — устанавливать в скважину цементную пробку (с целью её ликвидации);
to pull a well — ликвидировать скважину с извлечением лифтовых труб и насосного оборудования;
to put a well on production — вводить скважину в эксплуатацию;
to put a well on the pump — 1. начинать насосную эксплуатацию скважины; 2. устанавливать насосный подъёмник в скважине
to rework a well — восстановить дебит скважины;
to rock a well — возбуждать приток в скважине попеременным открытием и закрытием устья;
to shoot a well — торпедировать скважину;
to shut down a well — консервировать скважину (в процессе строительства);
to shut in a well — закрывать скважину, останавливать скважину (устьевой задвижкой);
to strip a well — попеременно двигать колонны насосных штанг и лифтовых труб в скважине (для предотвращения скопления парафина);
to suspend a well — законсервировать строящуюся скважину;
to test a well — измерять дебит скважины;
to wake up a well — вызывать приток пластового флюида в скважину;
well on the pump — насосная скважина;
— dry well— gas well— key well— oil well
* * *
скважина; колодец
* * *
* * *
2) резервуар; компенсационный колодец, отстойник, зумпф•well has stopped flowing naturally — скважина прекратила естественное фонтанирование;
well imperfect due of method of completion — скважина, несовершенная по способу заканчивания;
well in operation — действующая скважина;
well kicked off natural — скважина, начавшая фонтанировать без возбуждения, без тартания и без кислотной обработки;
well off — простаивающая скважина;
well on the beam — скважина с насосным подъёмником;
well on the pump — насосная скважина;
well out of control — открыто фонтанирующая скважина; скважина, фонтанирование которой не удается остановить ();
well out of operation — бездействующая скважина;
well put into production — скважина, введённая в эксплуатацию;
well set on packer — скважина, оборудования пакером;
to bean a well back — снижать дебит фонтанирующей скважины;
to bean a well up — повышать дебит фонтанирующей скважины;
to blow a well — открывать фонтанирующую скважину на короткое время (<<для удаления воды>);
to blow a well clean — продувать скважину;
to bring a well in — вызывать приток пластового флюида в скважину;
to bring in a well — ввести скважину в эксплуатацию;
to bump off a well — отсоединять насосную скважину от группового привода;
to cap a well — ликвидировать скважину;
to case a well — крепить скважину обсадными трубами, обсаживать ствол скважины;
to complete a well — 1) подготавливать скважину к эксплуатации 2) заканчивать скважину;
to drill a well — бурить скважину;
to drive a well — бурить скважину;
to dry up a well — откачивать жидкость из скважины;
to dual a well — 1) эксплуатировать одновременно два горизонта в скважине 2) использовать силовую установку одной скважины для эксплуатации другой;
to flow a well hard — эксплуатировать фонтанирующую скважину с максимально возможным дебитом;
to flush a well out — промывать скважину;
to get a well back on production — возвращать скважину в эксплуатацию;
to hand a well off — прекращать насосную эксплуатацию скважины;
to hand off a well — отсоединять насосную скважину от группового привода;
to junk a well — ликвидировать скважину;
to knife a well — чистить скважину ( от парафина) скребками;
to line a well — крепить скважину обсадными трубами, обсаживать ствол скважины;
to place a well on choke — начинать дросселировать поток из скважины с помощью штуцера;
to prepare a well for production — подготавливать скважину к эксплуатации;
to pull a well — ликвидировать скважину с извлечением насосно-компрессорных труб и насосного оборудования;
to put a well back on production — возвращать скважину в эксплуатацию;
to put a well into production — вводить скважину в эксплуатацию;
to put a well on production — вводить скважину в эксплуатацию;
to put a well on stream — вводить скважину в эксплуатацию;
to put a well on the pump — 1) начинать насосную эксплуатацию скважины 2) устанавливать насосный подъёмник в скважине;
to return a well on production — возвращать скважину в эксплуатацию; повторно вводить скважину в эксплуатацию;
to rework a well — восстановить дебит скважины;
to rock a well — возбуждать приток в скважине попеременным открытием и закрытием устья;
to shoot a well — торпедировать скважину;
to shut in a well — закрывать скважину; останавливать фонтанирование; останавливать скважину ( устьевой задвижкой);
to start a well — приступать к бурению скважины;
to strip a well — попеременно двигать колонны насосных штанг и насосно-компрессорных труб в скважине ( для предотвращения скопления парафина);
to suspend a well — консервировать строящуюся скважину;
to test a well — измерять дебит скважины;
to test a well for production — испытывать скважину на приток;
to wake up a well — вызывать приток пластового флюида в скважину;
to wash a well into production — вводить скважину в эксплуатацию понижением уровня воды;
- abandoned condensate wellto wash a well out — промывать скважину;
- abandoned gas well
- abandoned oil well
- abandoned oil-and-gas well
- abnormal-pressure well
- absorption well
- Abyssinian well
- adjacent well
- adjoining well
- appraisal well
- artesian well
- barefooted well
- barren well
- base well
- beam well
- beam-pumped well
- belching well
- benchmark well
- blow well
- blowing well
- blowout well
- blue sky exploratory well
- borderline well
- bore well
- Braden head gas well
- breakthrough well
- breathing well
- brought-in well
- cable-tool well
- cased well
- cased-through well
- cemented-up well
- center well
- closed-in well
- close-spaced wells
- cluster well
- commercial well
- completed well
- condensate well
- confirmation well
- connected well
- controlled directional well
- converted gas-input well
- cored well
- corner well
- corrosive well
- cratering well
- crooked well
- curved well
- dead well
- declined well
- deep well
- deflected well
- development well
- development gas well
- development test well
- deviated well
- deviating well
- dewatering well
- directional well
- directionally drilled well
- discovery well
- disposal well
- diving well
- down-dip well
- drain-hole well
- drawn well
- drawned-out well
- drill well
- drill ship well
- drill ship center well
- drilled well
- drilled gas-input well
- drilled water-input well
- drilling well
- driven well
- drowned well
- dry well
- dual well
- dual-completion well
- dual-completion gas well
- dual-completion oil well
- dually-completed well
- dual-pumping well
- dual-zone well
- edge well
- exception well
- exhausted well
- exploratory well
- extension well
- field well
- field development well
- fill-in well
- flank well
- flooded well
- flowing well
- flowing producing oil well
- fresh-water well
- fully penetrating well
- gas well
- gas-injection well
- gaslift well
- geophysical well
- geothermal well
- gurgling well
- gusher well
- hand dog well
- head well
- high-flow-rate well
- high-pressure well
- horizontal well
- hydrodynamically imperfect well
- hydrodynamically perfect well
- hypothetical well
- image well
- imperfect well
- inactive well
- inclined well
- individual well
- infill well
- injection well
- injured well
- input well
- inspection well
- intake well
- intracontour well
- isolated-branched well
- jack well
- junked well
- key well
- kicking well
- killed well
- killer well
- leaking well
- line well
- low pressure well
- marginal well
- medium-depth well
- monitor well
- most probably well
- mudded well
- mudded-up well
- multipay well
- multiple-completion well
- multiple-string small diameter well
- multiple-zone well
- multistring well
- natural well
- neighboring well
- noncommercial well
- nonproducing well
- nonproductive well
- observation well
- off-pattern injection well
- off-structure well
- offset well
- offshore well
- oil well
- old well drilled deeper
- old well plugged back
- old well worked-over
- old abandoned well
- on-structure well
- on-the-beam well
- on-the-pump well
- open hole well
- orifice well
- out-of-control well
- outpost extension well
- output well
- overhauled well
- partially penetrating well
- paying well
- perfect well
- perforated well
- perimeter well
- piestic well
- pinch-out well
- pioneer well
- pipe well
- planned well
- platform well
- plugged-and-abandoned well
- pressure well
- pressure-observation well
- pressure-relief well
- producing well
- producing oil well
- producing oil-and-gas well
- production well
- prolific well
- prospect well
- pumped well
- pumper well
- pumping well
- pumping producing oil well
- purposely deviated well
- purposely slanted well
- quadruple completion well
- recipient wells
- recovery well
- relief well
- returned well to production
- rod-line well
- running well
- salt-dome well
- salt-up well
- salt-water well
- salt-water disposal well
- salt-water injection well
- sand well
- sand-clogged well
- sanded well
- sanded-up well
- sanding-up well
- sand-plugged well
- sand-producing well
- sand-up well
- sandy well
- satellite well
- seabed well
- selective water-injection well
- service well
- shallow well
- shut-in well
- shut-in gas well
- shut-in oil well
- side well
- single well
- single-completion well
- single-jacker well
- single-string well
- slanted well
- slim hole well
- special well
- staggered wells
- steam well
- steam-injection well
- step-out well
- straight well
- stratigraphic well
- stratigraphic test well
- stripped well
- stripper well
- strong well
- structure test well
- subsalt well
- sunken well
- superdeep well
- supply well
- surging well
- suspended well
- temporarily abandoned well
- temporarily shut-in well
- test well
- triple-completion well
- tubed well
- turnkey well
- twin well
- two-casing well
- two-string well
- ultradeep well
- underwater well
- unloading well
- unprofitable well
- untubed well
- upstream well
- vertical well
- waste disposal well
- water well
- water-dependent well
- water-disposal well
- water-free well
- water-injection well
- water-producing well
- water-supply well
- wet well
- wide-spaced wells
- wild well
- wild gas well
- wildcat well
- worked-over well
- workover well* * * -
9 well
1. скважина2. колодец3. источник4. отстойник, зумпфdual completion gas well — газовая скважина, законченная в двух горизонтах
dual completion oil well — нефтяная скважина, законченная в двух горизонтах
multiple string small diameter well — скважина, пробуренная для одновременной и раздельной эксплуатации нескольких продуктивных горизонтов, в которую спущено две и более эксплуатационных колонн малого диаметра
well out of control — скважина, фонтанирование которой не удаётся закрыть; открыто фонтанирующая скважина
well producing from … — эксплуатационная скважина, проведенная на (такой-то) пласт
— dry well— gas well— key well— oil well— well off— wet well
* * *
to abandon a well — ликвидировать скважину;
to bean a well back — снижать дебит фонтанирующей скважины;
to bean a well up — повышать дебит фонтанирующей скважины;
to blow a well — открывать фонтанирующую скважину на короткое время (для удаления воды, песка);
to bring a well in — вызывать приток пластового флюида в скважину;
to bump off a well — отсоединять насосную скважину от группового привода;
to case a well — обсаживать ствол скважины;
to complete a well — заканчивать скважину;
to dry up a well — откачивать жидкость из скважины;
to flow a well hard — эксплуатировать фонтанирующую скважину с максимально возможным дебитом;
to flush a well out — промывать скважину;
to hand off a well — отсоединять насосную скважину от группового привода;
to junk a well — ликвидировать скважину;
to kill a well — глушить скважину (уравновешивать пластовое давление);
to knife a well — чистить скважину (от парафина) скребками;
to line a well — обсаживать ствол скважины;
to mud a well up — подавать буровой раствор в скважину (после бурения с продувкой);
to place a well on choke — начинать дросселировать поток из скважины с помощью штуцера;
to plug up a well — устанавливать в скважину цементную пробку (с целью её ликвидации);
to pull a well — ликвидировать скважину с извлечением лифтовых труб и насосного оборудования;
to put a well on production — вводить скважину в эксплуатацию;
to put a well on the pump — 1. начинать насосную эксплуатацию скважины; 2. устанавливать насосный подъёмник в скважине
to rework a well — восстановить дебит скважины;
to rock a well — возбуждать приток в скважине попеременным открытием и закрытием устья;
to shoot a well — торпедировать скважину;
to shut down a well — консервировать скважину (в процессе строительства);
to shut in a well — закрывать скважину, останавливать скважину (устьевой задвижкой);
to strip a well — попеременно двигать колонны насосных штанг и лифтовых труб в скважине (для предотвращения скопления парафина);
to suspend a well — законсервировать строящуюся скважину;
to test a well — измерять дебит скважины;
to wake up a well — вызывать приток пластового флюида в скважину;
well on the pump — насосная скважина;
— dry well— gas well— key well— oil well
* * *
скважина; колодец
* * *
* * *
2) резервуар; компенсационный колодец, отстойник, зумпф•well has stopped flowing naturally — скважина прекратила естественное фонтанирование;
well imperfect due of method of completion — скважина, несовершенная по способу заканчивания;
well in operation — действующая скважина;
well kicked off natural — скважина, начавшая фонтанировать без возбуждения, без тартания и без кислотной обработки;
well off — простаивающая скважина;
well on the beam — скважина с насосным подъёмником;
well on the pump — насосная скважина;
well out of control — открыто фонтанирующая скважина; скважина, фонтанирование которой не удается остановить ();
well out of operation — бездействующая скважина;
well put into production — скважина, введённая в эксплуатацию;
well set on packer — скважина, оборудования пакером;
to bean a well back — снижать дебит фонтанирующей скважины;
to bean a well up — повышать дебит фонтанирующей скважины;
to blow a well — открывать фонтанирующую скважину на короткое время (<<для удаления воды>);
to blow a well clean — продувать скважину;
to bring a well in — вызывать приток пластового флюида в скважину;
to bring in a well — ввести скважину в эксплуатацию;
to bump off a well — отсоединять насосную скважину от группового привода;
to cap a well — ликвидировать скважину;
to case a well — крепить скважину обсадными трубами, обсаживать ствол скважины;
to complete a well — 1) подготавливать скважину к эксплуатации 2) заканчивать скважину;
to drill a well — бурить скважину;
to drive a well — бурить скважину;
to dry up a well — откачивать жидкость из скважины;
to dual a well — 1) эксплуатировать одновременно два горизонта в скважине 2) использовать силовую установку одной скважины для эксплуатации другой;
to flow a well hard — эксплуатировать фонтанирующую скважину с максимально возможным дебитом;
to flush a well out — промывать скважину;
to get a well back on production — возвращать скважину в эксплуатацию;
to hand a well off — прекращать насосную эксплуатацию скважины;
to hand off a well — отсоединять насосную скважину от группового привода;
to junk a well — ликвидировать скважину;
to knife a well — чистить скважину ( от парафина) скребками;
to line a well — крепить скважину обсадными трубами, обсаживать ствол скважины;
to place a well on choke — начинать дросселировать поток из скважины с помощью штуцера;
to prepare a well for production — подготавливать скважину к эксплуатации;
to pull a well — ликвидировать скважину с извлечением насосно-компрессорных труб и насосного оборудования;
to put a well back on production — возвращать скважину в эксплуатацию;
to put a well into production — вводить скважину в эксплуатацию;
to put a well on production — вводить скважину в эксплуатацию;
to put a well on stream — вводить скважину в эксплуатацию;
to put a well on the pump — 1) начинать насосную эксплуатацию скважины 2) устанавливать насосный подъёмник в скважине;
to return a well on production — возвращать скважину в эксплуатацию; повторно вводить скважину в эксплуатацию;
to rework a well — восстановить дебит скважины;
to rock a well — возбуждать приток в скважине попеременным открытием и закрытием устья;
to shoot a well — торпедировать скважину;
to shut in a well — закрывать скважину; останавливать фонтанирование; останавливать скважину ( устьевой задвижкой);
to start a well — приступать к бурению скважины;
to strip a well — попеременно двигать колонны насосных штанг и насосно-компрессорных труб в скважине ( для предотвращения скопления парафина);
to suspend a well — консервировать строящуюся скважину;
to test a well — измерять дебит скважины;
to test a well for production — испытывать скважину на приток;
to wake up a well — вызывать приток пластового флюида в скважину;
to wash a well into production — вводить скважину в эксплуатацию понижением уровня воды;
- abandoned condensate wellto wash a well out — промывать скважину;
- abandoned gas well
- abandoned oil well
- abandoned oil-and-gas well
- abnormal-pressure well
- absorption well
- Abyssinian well
- adjacent well
- adjoining well
- appraisal well
- artesian well
- barefooted well
- barren well
- base well
- beam well
- beam-pumped well
- belching well
- benchmark well
- blow well
- blowing well
- blowout well
- blue sky exploratory well
- borderline well
- bore well
- Braden head gas well
- breakthrough well
- breathing well
- brought-in well
- cable-tool well
- cased well
- cased-through well
- cemented-up well
- center well
- closed-in well
- close-spaced wells
- cluster well
- commercial well
- completed well
- condensate well
- confirmation well
- connected well
- controlled directional well
- converted gas-input well
- cored well
- corner well
- corrosive well
- cratering well
- crooked well
- curved well
- dead well
- declined well
- deep well
- deflected well
- development well
- development gas well
- development test well
- deviated well
- deviating well
- dewatering well
- directional well
- directionally drilled well
- discovery well
- disposal well
- diving well
- down-dip well
- drain-hole well
- drawn well
- drawned-out well
- drill well
- drill ship well
- drill ship center well
- drilled well
- drilled gas-input well
- drilled water-input well
- drilling well
- driven well
- drowned well
- dry well
- dual well
- dual-completion well
- dual-completion gas well
- dual-completion oil well
- dually-completed well
- dual-pumping well
- dual-zone well
- edge well
- exception well
- exhausted well
- exploratory well
- extension well
- field well
- field development well
- fill-in well
- flank well
- flooded well
- flowing well
- flowing producing oil well
- fresh-water well
- fully penetrating well
- gas well
- gas-injection well
- gaslift well
- geophysical well
- geothermal well
- gurgling well
- gusher well
- hand dog well
- head well
- high-flow-rate well
- high-pressure well
- horizontal well
- hydrodynamically imperfect well
- hydrodynamically perfect well
- hypothetical well
- image well
- imperfect well
- inactive well
- inclined well
- individual well
- infill well
- injection well
- injured well
- input well
- inspection well
- intake well
- intracontour well
- isolated-branched well
- jack well
- junked well
- key well
- kicking well
- killed well
- killer well
- leaking well
- line well
- low pressure well
- marginal well
- medium-depth well
- monitor well
- most probably well
- mudded well
- mudded-up well
- multipay well
- multiple-completion well
- multiple-string small diameter well
- multiple-zone well
- multistring well
- natural well
- neighboring well
- noncommercial well
- nonproducing well
- nonproductive well
- observation well
- off-pattern injection well
- off-structure well
- offset well
- offshore well
- oil well
- old well drilled deeper
- old well plugged back
- old well worked-over
- old abandoned well
- on-structure well
- on-the-beam well
- on-the-pump well
- open hole well
- orifice well
- out-of-control well
- outpost extension well
- output well
- overhauled well
- partially penetrating well
- paying well
- perfect well
- perforated well
- perimeter well
- piestic well
- pinch-out well
- pioneer well
- pipe well
- planned well
- platform well
- plugged-and-abandoned well
- pressure well
- pressure-observation well
- pressure-relief well
- producing well
- producing oil well
- producing oil-and-gas well
- production well
- prolific well
- prospect well
- pumped well
- pumper well
- pumping well
- pumping producing oil well
- purposely deviated well
- purposely slanted well
- quadruple completion well
- recipient wells
- recovery well
- relief well
- returned well to production
- rod-line well
- running well
- salt-dome well
- salt-up well
- salt-water well
- salt-water disposal well
- salt-water injection well
- sand well
- sand-clogged well
- sanded well
- sanded-up well
- sanding-up well
- sand-plugged well
- sand-producing well
- sand-up well
- sandy well
- satellite well
- seabed well
- selective water-injection well
- service well
- shallow well
- shut-in well
- shut-in gas well
- shut-in oil well
- side well
- single well
- single-completion well
- single-jacker well
- single-string well
- slanted well
- slim hole well
- special well
- staggered wells
- steam well
- steam-injection well
- step-out well
- straight well
- stratigraphic well
- stratigraphic test well
- stripped well
- stripper well
- strong well
- structure test well
- subsalt well
- sunken well
- superdeep well
- supply well
- surging well
- suspended well
- temporarily abandoned well
- temporarily shut-in well
- test well
- triple-completion well
- tubed well
- turnkey well
- twin well
- two-casing well
- two-string well
- ultradeep well
- underwater well
- unloading well
- unprofitable well
- untubed well
- upstream well
- vertical well
- waste disposal well
- water well
- water-dependent well
- water-disposal well
- water-free well
- water-injection well
- water-producing well
- water-supply well
- wet well
- wide-spaced wells
- wild well
- wild gas well
- wildcat well
- worked-over well
- workover well* * * -
10 excavation
1. экскавация, отрывка грунта2. выемка, котлован3. резерв, резервный карьер4. производство земляных работ с устройством резервов; отрывка грунта с устройством резервовchannel excavation — отрывка канала; выемка под канал
5. глубокая разработка грунта6. глубокий котлованrock excavation — разработка скальных грунтов ; скальные работы
stripping excavation — снятие поверхностного слоя грунта; снятие растительного слоя грунта
test excavation — опытная выемка; опытный котлован
dewatering of excavation — водоотлив из котлована, осушение выемки
-
11 sludge incineration
сжигание ила
—
[ http://www.eionet.europa.eu/gemet/alphabetic?langcode=en]EN
sludge incineration
A method used for drying and reducing sludge volume and weight. Since incineration requires auxiliary fuel to obtain and maintain high temperature and to evaporate the water contained in the incoming sludge, concentration techniques should be applied before incineration. Sludge incineration is a two-step process involving drying and combustion after a preceding dewatering process, such as filters, drying beds, or centrifuges. (Source: CORBIT)
[http://www.eionet.europa.eu/gemet/alphabetic?langcode=en]Тематики
EN
DE
FR
установка для сжигания осушенного шлама
—
[А.С.Гольдберг. Англо-русский энергетический словарь. 2006 г.]Тематики
EN
Англо-русский словарь нормативно-технической терминологии > sludge incineration
См. также в других словарях:
Dewatering — (pronounced de water ing) is the removal of water from solid material or soil by wet classification, centrifugation, filtration, or similar solid liquid separation processes, such as removal of residual liquid from a filter cake by a filter press … Wikipedia
метод обезвоживания — — [http://slovarionline.ru/anglo russkiy slovar neftegazovoy promyishlennosti/] Тематики нефтегазовая промышленность EN dewatering method … Справочник технического переводчика
Mineral processing — Crushing, a form of comminution, one of the unit operations of mineral processing In the field of extractive metallurgy, mineral processing, also known as mineral dressing or ore dressing, is the process of separating commercially valuable… … Wikipedia
environmental works — ▪ civil engineering Introduction infrastructure that provides cities and towns with water supply, waste disposal, and pollution control services. They include extensive networks of reservoirs, pipelines, treatment systems, pumping stations … Universalium
Tailings — A panorama of Broken Hill, New South Wales, backed by the man made mullock (waste tailings) heaps from the Line of Lode mine (the mullock heaps are the hills that stretch across this image). Tailings, also called mine dumps, slimes, tails, leach… … Wikipedia
mineral processing — or ore dressing Mechanical treatment of crude ores to separate the valuable minerals. Mineral processing was at first applied only to ores of precious metals but later came to be used to recover other metals and nonmetallic minerals. It is also… … Universalium
Dolaucothi Gold Mines — The Dolaucothi Gold Mines (grid reference SN662403), also known as the Ogofau Gold Mine, are Roman surface and deep mines located in the valley of the River Cothi, near Pumsaint, Carmarthenshire, Wales. The gold mines are located within the… … Wikipedia
Coastal management — This article is about coastal management aimed to prevent erosion and flooding. For broader management issues, see Integrated coastal zone management. Oosterscheldekering sea wall, the Netherlands. In some jurisdictions the terms sea defense and… … Wikipedia
Coal preparation plant — A coal washer in Eastern Kentucky A coal preparation plant (CPP) is a facility that washes coal of soil and rock, preparing it for transport to market. A CPP may also be called a coal handling and preparation plant (CHPP), prep plant, tipple, or… … Wikipedia
Shaft construction — concerns the building of vertical openings such as Raises and Shafts. Shafts are vertical openings used for supplying equipment, personnel, and support systems to the horizontal tunnel where the pipeline is installed. They can be temporary or… … Wikipedia
Fourdrinier machine — The Fourdrinier Machine is the basis for most modern papermaking, and it has been used in some variation since its conception. The Fourdrinier accomplishes all the steps needed to transform a source of wood pulp into a final paper… … Wikipedia