41 critical path theory
critical path theory ECON, STAT Kritische-Wege-Theorie f (Operations Research, Netzplantechnik; CPA = critical path analysis = CPM = critical path method)Englisch-Deutsch Fachwörterbuch der Wirtschaft > critical path theory
-
42 critical path method
critical path method (CPM) ECON, STAT (jarg) CPM-Methode f, Analyse f des kritischen Weges (Operations Research, Netzplantechnik; synonymous: CPA = critical path analysis; Methode der Netzplantechnik, die zur Analyse und Darstellung der Struktur komplexer Projektabläufe Vorgangspfeile benutzt, statt z. B. Ereignisknoten wie PERT = AE program evaluation and review technique oder statt Vorgangsknoten wie MPM = metra potential method = Metra-Potenzial-Methode)Englisch-Deutsch Fachwörterbuch der Wirtschaft > critical path method
-
43 critical path
1) упр., иссл. опер. критический путь (самая длительная последовательность выполнения работ при реализации проекта, т. е. последовательность работ, показывающая минимально необходимое время для завершения проекта)See:slack, critical path analysis, critical path activity, critical path accounting, shortest path, operations management2) упр. критический путь (совокупность критических задач [работ\])See:* * ** * *порядок проработки (проекта), установленный порядок и сроки реализации (проекта), основные этапы (реализации проекта). . Словарь экономических терминов . -
44 critical path accounting
учет учет методом критического пути* (метод учета, применяющийся вместе с методом критического пути управления проектом и предполагающий учет затрат на рабочую силу, материалы и накладных расходов по операциям и шагам выполнения данного проекта)See:Англо-русский экономический словарь > critical path accounting
-
45 critical path scheduling
упр., иссл. опер. планирование методом критического пути* (методика планирования, при которой для определения времени, необходимого для завершения проекта, составляется график, на котором указываются работы, требующие выполнения, последовательность работ, необходимое для выполнения каждой работы время и определяется непрерывная последовательность работ, требующая наибольшего времени для выполнения)Syn:See:* * *Англо-русский экономический словарь > critical path scheduling
-
46 critical path method
-
47 critical path technique
упр., иссл. опер. = critical path analysisАнгло-русский экономический словарь > critical path technique
-
48 critical-path method
упр. иссл. опер. = critical path analysis -
49 critical path
-
50 critical-path method
Gen Mgt, Opsa network analysis planning technique used especially in project management to identify the activities within a project that are critical for its success.In critical-path method, individual activities within a project and their duration are recorded in a diagram or flow chart. A critical path is plotted through the diagram, showing the sequence in which activities must be completed in order to complete the project in the shortest amount of time, incurring the least cost. -
51 critical path activity
иссл. опер. критическая работа [операция\]* (в сетевом планировании: работа, принадлежащая критическому пути, т. е. работа, задержка в выполнении которой приведет к задержке окончания выполнения всего комплекса работ)Syn:See:Англо-русский экономический словарь > critical path activity
-
52 critical
critical ['krɪtɪkəl]∎ at a critical time à un moment critique ou crucial;∎ he's in a critical condition or on the critical list il est dans un état critique;∎ the next few days will be critical les prochains jours seront décisifs∎ to be critical of sb/sth (person) se montrer ou être critique à l'égard de qn/qch; (report, article etc) être critique à l'égard de qn/qch;∎ he's very critical of others il critique beaucoup les autres, il est très critique vis-à-vis des autres;∎ to look at sth with a critical eye regarder qch d'un œil critique;∎ don't be so critical ne soyez pas si négatif(c) (analysis, edition) critique; (essay, study) critique, de critique; (from the critics) des critiques;∎ the play met with critical acclaim la pièce fut applaudie par la critique∎ the nuclear reactor went critical le réacteur a atteint le seuil critique►► Physics critical angle angle m critique;Physics critical mass masse f critique;Commerce & Technology critical path chemin m critique;Commerce & Technology critical path analysis analyse f du chemin critique;Commerce & Technology critical path method méthode f du chemin critique;Commerce & Technology critical path model modèle m du chemin critique;Physics critical temperature température f critique -
53 analysis
- analysis
- n1. анализ, исследование, изучение
2. расчёт, исчисление, вычисление
- analysis of sections
- analysis of shells
- analysis of structures
- analysis of trusses
- activity analysis
- approximate analysis
- arch analysis
- bending analysis
- benefit cost analysis
- break-even analysis
- buckling analysis
- cement content analysis
- coarse analysis
- core analysis
- correlation analysis
- critical path analysis
- differential thermal analysis
- Dunagan analysis
- dynamic analysis
- elastoplastic analysis
- experimental analysis
- failure analysis
- feasibility analysis
- fine analysis
- finite element analysis
- flood-frequency analysis
- folded plate analysis
- free-vibration analysis
- graphical analysis
- graphical analysis of trusses
- graphical structural analysis
- hydrograph analysis
- hypsometric analysis
- influence line analysis
- innovative analysis
- linear elastic analysis
- linearized analysis
- matrix analysis
- mechanical analysis
- model analysis
- model analysis of structures
- network analysis
- nondestructive test analysis
- numerical analysis
- overhead analysis
- particle-size analysis
- performance analysis
- pipette analysis
- plane stress analysis
- precise analysis
- qualitative analysis
- quantitative analysis
- river-basin analysis
- screen analysis
- sedimentation analysis
- sieve analysis
- soil analysis
- static analysis
- stress analysis
- stress analysis beyond the elastic limit
- stress-path settlement analysis
- structural analysis
- systems analysis
- terrain analysis
- theoretical analysis of stress
- thermographical analysis
- three-dimensional analysis
- time-dependent analysis
- ultimate load analysis
- wet analysis
- wet mechanical analysis
- X-ray diffraction analysis
Англо-русский строительный словарь. — М.: Русский Язык. С.Н.Корчемкина, С.К.Кашкина, С.В.Курбатова. 1995.
-
54 critical
1 adjAIR TRANSP, CHEM, MECH ENG, NUCL, QUALITY crítico2 -
55 critical
critical illness insurance assurance f longue maladie;critical path chemin m critique;critical path analysis analyse f du chemin critique;critical path method méthode f du chemin critique;critical path model modèle m du chemin critique -
56 critical
1) (judging and analysing: He has written several critical works on Shakespeare.) crítico2) (fault-finding: He tends to be critical of his children.) crítico, severo3) (of, at or having the nature of, a crisis; very serious: a critical shortage of food; After the accident, his condition was critical.) crítico, grave, seriocritical adj críticotr['krɪtɪkəl]1 (anaylsis, essay, work, etc) crítico,-a2 (negative, finding fault) criticón,-ona, quisquilloso,-a3 (decisive, crucial, very serious) crítico,-a\SMALLIDIOMATIC EXPRESSION/SMALLto be critical of something/somebody criticar algo/a alguiento be very critical ser dado,-a a las críticasto go critical (of nuclear reactor) iniciar una reacción en cadenato receive critical acclaim recibir buenas críticascritical temperature temperatura críticacritical ['krɪt̬ɪkəl] adj: críticoadj.• criticón, -ona adj.• crítico, -a adj.• decisivo, -a adj.• extremo, -a adj.'krɪtɪkəl1)a) ( censorious) <remark/report> críticoto be critical OF something/somebody — criticar* algo/a alguien
b) (journalistic, academic) crítico2)a) ( very serious) <condition/shortage> crítico['krɪtɪkǝl]1. ADJ1) (=important) [factor, element] crítico; [issue] apremiante; [problem] muy serioit is critical to understand what is happening — es de vital importancia entender lo que está ocurriendo
how you finance a business is critical to its success — el éxito de un negocio depende de forma crucial de cómo se financie
2) (=decisive) [moment, stage] crítico3) (=perilous, serious) [situation, state] crítico4) (Med) [patient, condition, illness] grave5) (=fault-finding) [attitude, remark, report] críticohe's too critical — siempre está criticando, critica demasiado
to be critical of sth/sb — criticar algo/a algn
6) (=analytical) [person, reader, analysis] crítico7) (Cine, Literat, Mus, Theat) críticoto be a critical success — [book, play etc] ser un éxito de crítica
8) (Phys, Nuclear physics) [temperature, pressure] crítico2.CPDcritical angle N — (Aer) (Opt) ángulo m crítico
critical care unit N — unidad f de cuidados intensivos, unidad f de terapia intensiva (S. Cone, Mex)
critical edition N — edición f critica
critical essays NPL — ensayos mpl de crítica
critical mass N — masa f crítica
critical path analysis N — análisis m inv del camino crítico
* * *['krɪtɪkəl]1)a) ( censorious) <remark/report> críticoto be critical OF something/somebody — criticar* algo/a alguien
b) (journalistic, academic) crítico2)a) ( very serious) <condition/shortage> crítico -
57 analysis
- analysis of observations
- analysis of optical spectrum - activation analysis
- a-posteriori analysis
- approximate analysis
- a-priori analysis
- automatic number analysis
- batch circuit analysis
- behavioral analysis
- binding-time analysis
- bottom-up analysis
- cepstral analysis
- cipher analysis
- circuit analysis
- cluster analysis
- combinatorial analysis
- comparative analysis
- compatibility analysis
- complex analysis
- content analysis
- contingency analysis
- conversational analysis
- cost analysis
- cost/benefit analysis
- covariance analysis
- critical path analysis
- crystal analysis
- cyclic analysis
- dataflow analysis
- decision-tree analysis
- dimensional analysis
- discourse analysis
- discriminant analysis
- display data analysis
- domain analysis
- EDX analysis
- electron diffraction analysis
- electron probe analysis
- empirical analysis
- energy-dispersive X-ray analysis
- error analysis
- factor analysis
- failure analysis - fluorescence analysis
- Fourier analysis
- fractal image analysis
- frequency analysis
- frequency-domain analysis
- frequency-response analysis
- functional analysis
- fuzzy analysis
- fuzzy logic analysis
- harmonic analysis
- incremental circuit analysis
- interactive signal analysis
- interferometric analysis
- interval analysis
- joint analysis
- Kaplan-Meier analysis
- kernel discriminant analysis
- k-means cluster analysis
- large-signal analysis
- laser microprobe analysis
- linear two-group discriminant analysis
- linguistic analysis
- logic analysis
- logistic analysis
- logit analysis
- log-linear analysis
- luminescent analysis
- magnetic neutron diffraction analysis
- malfunction analysis
- mathematical analysis
- matrix analysis
- maximum-likelihood analysis
- means/ends analysis
- memory operating characteristic analysis
- mesh analysis
- meta-analysis
- microprobe analysis
- mixed-level analysis
- mixed-mode analysis
- modified nodal analysis
- Monte-Carlo analysis
- morphological analysis
- multifactor analysis of variance
- multilevel analysis
- multimode analysis
- multiple discriminant analysis
- multivariate analysis
- network analysis
- nodal analysis
- numerical analysis - operation analysis
- path analysis
- phase-plane analysis
- photon analysis
- photothermoelectric analysis
- policy analysis - probabilistic analysis
- problem analysis
- protocol analysis
- qualitative analysis
- quantitative analysis
- radar signal analysis
- radiographic analysis
- radiometric analysis
- randomized block analysis of variance
- receiver operating characteristic analysis
- regression analysis
- regression correlation analysis
- repeated measures analysis of variance
- requirements analysis
- risk analysis
- sampling analysis
- set analysis
- signature analysis
- single-mode analysis
- small-signal analysis
- sound analysis
- sparse table analysis
- spectral analysis
- spectrophotometric analysis
- spectrum signature analysis
- speech analysis
- static analysis
- statistical analysis
- sticky analysis
- structural analysis
- structured analysis
- structured systems analysis
- survival analysis
- syntactic analysis
- syntactical analysis
- system analysis
- system analysis in control
- tensor analysis
- time-domain analysis
- time-to-event analysis
- top-down analysis
- topological analysis
- traffic analysis
- trend analysis
- two-factor factorial analysis of variance
- wave-length dispersive X-ray analysis
- weighted analysis
- what if analysis
- worst-case analysis
- X-ray analysis
- X-ray spectral analysis
- X-ray structure analysis -
58 analysis
- a posteriori analysis
- a priori analysis
- activation analysis
- analysis of covariance
- analysis of means
- analysis of observations
- analysis of optical spectrum
- analysis of variance
- approximate analysis
- automatic number analysis
- batch circuit analysis
- behavioral analysis
- binding-time analysis
- bottom-up analysis
- cepstral analysis
- cipher analysis
- circuit analysis
- cluster analysis
- combinatorial analysis
- comparative analysis
- compatibility analysis
- complex analysis
- content analysis
- contingency analysis
- conversational analysis
- cost analysis
- cost/benefit analysis
- covariance analysis
- critical path analysis
- crystal analysis
- cyclic analysis
- dataflow analysis
- decision-tree analysis
- dimensional analysis
- discourse analysis
- discriminant analysis
- display data analysis
- domain analysis
- EDX analysis
- electron diffraction analysis
- electron probe analysis
- empirical analysis
- energy-dispersive X-ray analysis
- error analysis
- factor analysis
- failure analysis
- failure mode and effects analysis
- fault-tree analysis
- feature analysis
- finite element analysis
- flow analysis
- fluorescence analysis
- Fourier analysis
- fractal image analysis
- frequency analysis
- frequency-domain analysis
- frequency-response analysis
- functional analysis
- fuzzy analysis
- fuzzy logic analysis
- harmonic analysis
- incremental circuit analysis
- interactive signal analysis
- interferometric analysis
- interval analysis
- joint analysis
- Kaplan-Meier analysis
- kernel discriminant analysis
- k-means cluster analysis
- large-signal analysis
- laser microprobe analysis
- linear two-group discriminant analysis
- linguistic analysis
- logic analysis
- logistic analysis
- logit analysis
- log-linear analysis
- luminescent analysis
- magnetic neutron diffraction analysis
- malfunction analysis
- mathematical analysis
- matrix analysis
- maximum-likelihood analysis
- means/ends analysis
- memory operating characteristic analysis
- mesh analysis
- meta-analysis
- microprobe analysis
- mixed-level analysis
- mixed-mode analysis
- modified nodal analysis
- Monte-Carlo analysis
- morphological analysis
- multifactor analysis of variance
- multilevel analysis
- multimode analysis
- multiple discriminant analysis
- multivariate analysis
- network analysis
- nodal analysis
- numerical analysis
- object-oriented analysis
- off-line circuit analysis
- operation analysis
- path analysis
- phase-plane analysis
- photon analysis
- photothermoelectric analysis
- policy analysis
- predictable failure analysis
- principal components analysis
- probabilistic analysis
- problem analysis
- protocol analysis
- qualitative analysis
- quantitative analysis
- radar signal analysis
- radiographic analysis
- radiometric analysis
- randomized block analysis of variance
- receiver operating characteristic analysis
- regression analysis
- regression correlation analysis
- repeated measures analysis of variance
- requirements analysis
- risk analysis
- sampling analysis
- set analysis
- signature analysis
- single-mode analysis
- small-signal analysis
- sound analysis
- sparse table analysis
- spectral analysis
- spectrophotometric analysis
- spectrum signature analysis
- speech analysis
- static analysis
- statistical analysis
- sticky analysis
- structural analysis
- structured analysis
- structured systems analysis
- survival analysis
- syntactic analysis
- syntactical analysis
- system analysis in control
- system analysis
- tensor analysis
- time-domain analysis
- time-to-event analysis
- top-down analysis
- topological analysis
- traffic analysis
- trend analysis
- two-factor factorial analysis of variance
- wave-length dispersive X-ray analysis
- weighted analysis
- what if analysis
- worst-case analysis
- X-ray analysis
- X-ray spectral analysis
- X-ray structure analysisThe New English-Russian Dictionary of Radio-electronics > analysis
-
59 analysis
анализ, исследование- analysis of failure - analysis of operating costs - analysis of sections - analysis of structure - analysis of the truss joints - analysis of the working environment - analysis of water content - absorption analysis - approximate analysis - architectural analysis - bacteriological analysis - check analysis - chemical analysis - chromatographic analysis - compositional analysis - comprehensive analysis - computer analysis - correlation analysis - cost-benefit analysis - cross-correlation analysis - dynamic analysis - element analysis - end-point analysis - engineering analysis - environmental impact analysis - express analysis - fail-safe analysis - fault analysis - feasibility analysis - feasibility study and analysis - finit element analysis - frequency analysis - grain-size analysis - gravimetric analysis - laboratory analysis - large deflection analysis - long-term economic analysis - microbial analysis - model analysis of structures - nonlinear analysis - qualitative analysis - raw water design analysis - reliability analysis - runoff analysis - seismic analysis - size analysis - stress analysis - structural analysis - surrogate analysis - risk analysis - thermal-stress analysis - time-history analysis - titrometric analysis - total analysis - waste water analysis - water analysis - water budget analysis - X-ray analysis* * *1. анализ, исследование, изучение2. расчёт, исчисление, вычисление- analysis of sections
- analysis of shells
- analysis of structures
- analysis of trusses
- activity analysis
- approximate analysis
- arch analysis
- bending analysis
- benefit cost analysis
- break-even analysis
- buckling analysis
- cement content analysis
- coarse analysis
- core analysis
- correlation analysis
- critical path analysis
- differential thermal analysis
- Dunagan analysis
- dynamic analysis
- elastoplastic analysis
- experimental analysis
- failure analysis
- feasibility analysis
- fine analysis
- finite element analysis
- flood-frequency analysis
- folded plate analysis
- free-vibration analysis
- graphical analysis
- graphical analysis of trusses
- graphical structural analysis
- hydrograph analysis
- hypsometric analysis
- influence line analysis
- innovative analysis
- linear elastic analysis
- linearized analysis
- matrix analysis
- mechanical analysis
- model analysis
- model analysis of structures
- network analysis
- nondestructive test analysis
- numerical analysis
- overhead analysis
- particle-size analysis
- performance analysis
- pipette analysis
- plane stress analysis
- precise analysis
- qualitative analysis
- quantitative analysis
- river-basin analysis
- screen analysis
- sedimentation analysis
- sieve analysis
- soil analysis
- static analysis
- stress analysis
- stress analysis beyond the elastic limit
- stress-path settlement analysis
- structural analysis
- systems analysis
- terrain analysis
- theoretical analysis of stress
- thermographical analysis
- three-dimensional analysis
- time-dependent analysis
- ultimate load analysis
- wet analysis
- wet mechanical analysis
- X-ray diffraction analysis -
60 analysis
n1) (pl analyses)2) анализ, изучение, исследование3) статистическая таблица (цифровой материал)
- accuracy analysis
- activity analysis
- aggregate analysis
- approximate analysis
- balance-sheet analysis
- batch analysis
- benefit-risk analysis
- break-even analysis
- budget analysis
- business analysis
- business cycle analysis
- careful analysis
- cash flow analysis
- check analysis
- commodity analysis
- comparative analysis
- competitiveness analysis
- complete analysis
- complex analysis
- comprehensive analysis
- computer-aided analysis
- consumer analysis
- continuous analysis
- contrastive analysis
- cost analysis
- correlation analysis
- cost-benefit analysis
- cost-effectiveness analysis
- cost-performance analysis
- cost-sensitivity analysis
- country collectibility analysis
- critical path analysis
- cross-impact analysis
- cyclical analysis
- data analysis
- decision analysis
- decision-flow analysis
- demand analysis
- demand-consumption analysis
- demand-supply analysis
- design analysis
- detailed analysis
- diagnostic analysis
- discriminant analysis
- discriminatory analysis
- downward analysis
- ecological analysis
- economic analysis
- economical analysis
- empirical analysis
- end-point analysis
- engineering analysis
- engineering-economic analysis
- environmental analysis
- equipment quality analysis
- error analysis
- ex ante analysis
- expenses analysis
- ex post analysis
- express analysis
- factor analysis
- failure analysis
- feasibility analysis
- field analysis
- field complaint analysis
- field return analysis
- financial analysis
- financial ratio analysis
- financial statement analysis
- fiscal analysis
- flow-of-funds analysis
- formal analysis
- functional-cost analysis
- fundamental analysis
- funds analysis
- game-theoretic analysis
- gap analysis
- global analysis
- graphical analysis
- gross profit analysis
- horizontal analysis
- income analysis
- income-expenditure analysis
- in-depth analysis
- indicator analysis
- input-output analysis
- interaction analysis
- interindustry analysis
- inventory analysis
- investment analysis
- job analysis
- laboratory analysis
- least-square
- liquidity preference analysis
- long-run analysis
- loss analysis
- lot analysis
- macroeconomic analysis
- maintainability analysis
- maintenance analysis
- marginal analysis
- market analysis
- marketing cost analysis
- marketing plan analysis
- market opportunity analysis
- market situation analysis
- market structure analysis
- market trend analysis
- mechanical analysis
- media analysis
- money-flow analysis
- motion analysis
- motivation research analysis
- needs analysis
- network analysis
- normative analysis
- numerical analysis
- observational analysis
- on-line analysis
- operating analysis
- operating cost analysis
- operation analysis
- opportunity analysis
- order analysis
- organizational structure analysis
- overhead analysis
- partial analysis
- performance analysis
- performance degradation analysis
- periodic analysis
- pilot analysis
- population analysis
- portfolio analysis
- preinvestment analysis
- preliminary analysis
- price analysis
- primary analysis
- priority analysis
- process analysis
- product analysis
- product quality analysis
- profit analysis
- profitability analysis
- qualitative analysis
- quality analysis
- quality cost analysis
- quantitative analysis
- queueing analysis
- quick analysis
- ranging analysis
- rapid analysis
- ratio analysis
- real-time analysis
- relevance analysis
- reliability analysis
- reliability variation analysis
- risk analysis
- safety analysis
- sales analysis
- sales mix analysis
- sample analysis
- sampling analysis
- savings-investment analysis
- scrap-cost analysis
- sensitivity analysis
- sequential analysis
- short-cut analysis
- short-run analysis
- short-term analysis
- simulation analysis
- solvency analysis
- statement analysis
- statistical analysis
- stock analysis
- structural analysis
- subjective analysis
- supply analysis
- system's analysis
- tabular analysis
- team analysis
- thorough analysis
- time analysis
- time-series analysis
- total time analysis
- trade-off analysis
- trend analysis
- transaction cost analysis
- upward trend analysis
- value analysis
- value engineering analysis
- variance analysis
- vector analysis
- weather analysis
- worst-case analysis
- workload analysis
- X-ray analysis
- analysis by economic sector
- analysis of accounts
- analysis of assets and liabilities by maturities
- analysis of business activity
- analysis of corporate cash flows
- analysis of economic activity
- analysis of the economic performance of an enterprise
- analysis of feasibility
- analysis of foreign currency position
- analysis of the future development
- analysis of indices dynamics
- analysis of the market situation
- analysis of prediction
- analysis of profitability
- analysis of results
- carry out analysis
- make analysisEnglish-russian dctionary of contemporary Economics > analysis
См. также в других словарях:
critical path analysis — ➔ analysis … Financial and business terms
critical path analysis — noun The working out with the aid of a computer the sequence of operations that must be followed in order to complete a complex piece of work in the minimum time • • • Main Entry: ↑critic … Useful english dictionary
critical path analysis — CPA A decision making philosophy that seeks to minimize the time required to complete an activity by reference to the longest (or critical ) path of activity. The aim of critical path analysis is to improve efficiencies along the critical path in … Auditor's dictionary
Critical Path Analysis — A project management technique that lays out all the activities needed to complete a task, the time it will take to complete each activity and the relationships between the activities. Also called the critical path method , critical path analysis … Investment dictionary
critical path analysis — kritinio kelio analizė statusas T sritis automatika atitikmenys: angl. critical path analysis vok. Analyse des kritischen Pfades, f rus. анализ критического пути, m pranc. analyse du chemin critique, f … Automatikos terminų žodynas
Critical Path Analysis - CPA — A process by which projects are outlined and sequenced to have the most favorable outcome. Critical path analysis involves the advanced and careful planning of complicated projects, taking into consideration the sequence of activities that must… … Investment dictionary
critical-path analysis — CPA; = critical path method; = CPM; = network analysis; = programme evaluation and review technique; = PERT A decision making technique to determine the minimum time needed to complete a project by establishing the time taken to complete the… … Accounting dictionary
critical path analysis — /ˌkrɪtɪk(ə)l pɑ:θ əˌnæləsɪs/ noun 1. analysis of the way a project is organised in terms of the minimum time it will take to complete, calculating which parts can be delayed without holding up the rest of the project 2. same as critical path… … Marketing dictionary in english
critical path analysis — ▪ management technique for controlling and coordinating the various activities necessary in completing a major project. It utilizes a chart that consists essentially of a series of circles, each of which represents a particular part of a… … Universalium
critical path analysis — noun plural critical path analyses (C) technnical a method of planning a large piece of work so that there will be few delays and the cost will be as low as possible … Longman dictionary of contemporary English
critical-path analysis — Management analysis of the most important sequence of an operation … American business jargon