bcwp

  • 21 SV

    The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled.
    SV

    English-Arabic terms dictionary > SV

  • 22 to complete performance index

    "The ratio of the work remaining to be done to funds remaining to be spent, as of the status date [BAC - BCWP]/[BAC - ACWP]. A TCPI value greater than one indicates a need for increased performance; less than one indicates performance can decrease."

    English-Arabic terms dictionary > to complete performance index

  • 23 TCPI

    "The ratio of the work remaining to be done to funds remaining to be spent, as of the status date [BAC - BCWP]/[BAC - ACWP]. A TCPI value greater than one indicates a need for increased performance; less than one indicates performance can decrease."

    English-Arabic terms dictionary > TCPI

  • 24 schedule performance index (SPI)

    "The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned."

    English-Arabic terms dictionary > schedule performance index (SPI)

См. также в других словарях:

  • BCWP — Budgeted Cost of Work Performed (Governmental » Military) …   Abbreviations dictionary

  • BCWP — Budgeted Cost of Work Performed …   Acronyms

  • BCWP — Budgeted Cost of Work Performed …   Acronyms von A bis Z

  • BCWP — 1. Budgeted Cost of Work Performed Contributor: MSFC 2. Budgeted Cost of Work Performed (Earned Value) Contributor: LaRC 3. Budgeted Cost for Work Performed Contributor: GSFC …   NASA Acronyms

  • Earned value management — (EVM) is a project management technique for measuring project performance and progress in an objective manner. EVM has the ability to combine measurements of scope, schedule, and cost in a single integrated system. Earned Value Management is… …   Wikipedia

  • Budgeted cost of work scheduled — (BCWS), also referred to as Planned Value (PV), is a term from earned value management, a project management technique that seeks to measure forward progress in an objective manner. BCWS is defined as the approved budget that has been allocated… …   Wikipedia

  • Earned Value Management — Gestion de la valeur acquise Introduction La gestion de la valeur acquise (en anglais, Earned Value Management , d’où l’acronyme EVM) est une méthodologie créé aux Etats Unis d’Amérique dans le but de pouvoir mesurer les performances de la… …   Wikipédia en Français

  • Gestion de la valeur acquise — La méthode de la valeur acquise (en anglais, Earned Value Management , d’où l’acronyme EVM) est une méthodologie créée aux États Unis d’Amérique pour pouvoir mesurer les performances de la production industrielle, ou de la conduite d un projet.… …   Wikipédia en Français

  • Gestion de valeur acquise — Gestion de la valeur acquise Introduction La gestion de la valeur acquise (en anglais, Earned Value Management , d’où l’acronyme EVM) est une méthodologie créé aux Etats Unis d’Amérique dans le but de pouvoir mesurer les performances de la… …   Wikipédia en Français

  • Valeur acquise — Gestion de la valeur acquise Introduction La gestion de la valeur acquise (en anglais, Earned Value Management , d’où l’acronyme EVM) est une méthodologie créé aux Etats Unis d’Amérique dans le but de pouvoir mesurer les performances de la… …   Wikipédia en Français

  • Arbeitswertanalyse — Die Earned Value Analysis bzw. Leistungswertanalyse (z.T. auch als Fertigstellungswertmethode oder Arbeitswertanalyse bezeichnet) ist ein Werkzeug des Projektcontrollings. Sie dient zur Fortschrittsbewertung von Projekten. Dabei wird die aktuelle …   Deutsch Wikipedia